2
edits
Changes
no edit summary
Begun in 1973 and completed in 1975, this brick behemouth cost $4.8 million to construct. It originally had 97,250-square feet of space, which included room for 489,500 volumes. Sawyer holds the majority of the college's books, especially (but not exclusively) those which do not pertain to the hard sciences. Generally, Sawyer draws a predominately D1 crowd.
Ugly on the outside, bland and depressing on the inside. Thank goodness they're tearing it down.