949
edits
Willipedia is now back online as of 5/5/2019 |
It has been several years since Willipedia closed. Please help get it updated! |
Go to the Willipedia 2.0 Project to learn more. |
Changes
m
==Begins 2007==The so-called Stetson-Sawyer Project is slated to begin over [[Spring Break ]] 2007 with rock-blasting to make way for the foundation of the North Academic Building, much to the chagrin of [[Dodd House|Dodd]] residents, who, after being detoured around construction for two months this fall, will once again find themselves cut off from the campus (see map of construction).
formatting, links
[[Category:Building]]
[[Image:Stetson-Sawyer construction zone 2007.jpg|thumb|right|The planned site layout]]
==New Buildings==
The construction is projected to be finished in 2011 and will include two new buildings for faculty offices, a new [[library ]] attached to the back of [[Stetson Hall|Stetson]], and the razing of [[Sawyer Library|Sawyer]]. The new library will also be named Sawyer, according to the architects. These new buildings will enclose a new quad with a line of sight past the edge of the new [[Paresky Center]] to the mountains beyond.
==Parking==
Because [[Sawyer Drive ]] will be closed during construction, the [[student parking ]] around the buildings of the Dodd Quad will be reassigned to faculty lots.
==See also==
*For site plans and more information, see the official [http://www.williams.edu/go/stetsonsawyer|Stetson-Sawyer Project Website].