Difference between revisions of "Prospect House"

m (I'm making a Kitchens page like the pianos page.)
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Prospect House is on the south side of the [[Odd Quad]] and was original built in 1962 at a cost of $1,200,000 by the architectural firm <i>Shepley, Bulfinch, Richardson and Abbott</i>.
+
[[Category:Student Housing 2.0]]
 +
Prospect House is on the south side of the [[Odd Quad]] and was originally built in 1962 at a cost of $1,200,000 by the architectural firm ''Shepley, Bulfinch, Richardson and Abbott''.
  
 
It was renovated in 2004-05 with these costs:
 
It was renovated in 2004-05 with these costs:
Line 8: Line 9:
 
  General Contractor: MLB
 
  General Contractor: MLB
  
These renovations also removed the fabled [[Crows Nest|Crows Nests]], common rooms for just two doubles that used to span the width of two full rooms.
+
These renovations also removed the fabled [[crow's nest]]s, common rooms for just two doubles that used to span the width of two full rooms.
  
 
Prospect comprises [[Green Up]] in addition to eight other residential half-floors and a sweet basement with a sprawling common area and a space-age [[Kitchens|kitchen]]. The house has some great views of the area to the south of campus. [[Prospect Abs]] are a weeknightly ritual on the 4th floor (see the [http://wso.williams.edu/wiki/index.php/Cross_Country_Running cross country team] for details).
 
Prospect comprises [[Green Up]] in addition to eight other residential half-floors and a sweet basement with a sprawling common area and a space-age [[Kitchens|kitchen]]. The house has some great views of the area to the south of campus. [[Prospect Abs]] are a weeknightly ritual on the 4th floor (see the [http://wso.williams.edu/wiki/index.php/Cross_Country_Running cross country team] for details).
 
The floor plan is not up to scale. Some of the rooms are much smaller. Or so assumes [[Daniel Klein '06]], but he may be trying to cover for his own inability to accurately compare room sizes in floor plans.
 

Latest revision as of 23:56, September 27, 2016

Prospect House is on the south side of the Odd Quad and was originally built in 1962 at a cost of $1,200,000 by the architectural firm Shepley, Bulfinch, Richardson and Abbott.

It was renovated in 2004-05 with these costs:

Student Life Improvements: $2,000,000 
 Renovation: $5,100,000 
 Radio Station: $650,000 
Architect: Black River Design 
General Contractor: MLB

These renovations also removed the fabled crow's nests, common rooms for just two doubles that used to span the width of two full rooms.

Prospect comprises Green Up in addition to eight other residential half-floors and a sweet basement with a sprawling common area and a space-age kitchen. The house has some great views of the area to the south of campus. Prospect Abs are a weeknightly ritual on the 4th floor (see the cross country team for details).