Difference between revisions of "Main Page"

(edits to main page)
(adding free food notice)
Line 13: Line 13:
 
<div style="float: left; width: 300px;">
 
<div style="float: left; width: 300px;">
 
==Paresky Center Opening==
 
==Paresky Center Opening==
The [[Paresky Center]] is due to open during Winter Carnival of 2007.  It replaces the old [[Baxter Hall]] as the student center and a gathering point on campus.  The [[Snack Bar]] will be moved out of [[Mission Dining Hall|Mission]]; Grab & Go will relocate from [[Goodrich Hall|Goodrich]]; and students will get new [[SU box|mailboxes]].  Students in the [[Frosh Quad]] will no longer have to put up with noisy construction, at least until the Stetson-Sawyer Project starts.
+
The [[Paresky Center]] is due to open during [[Winter Carnival]] of 2007, during which [[free stuff|free food]] will be served during selected hours.  It replaces the old [[Baxter Hall]] as the student center and a gathering point on campus.  The [[Snack Bar]] will be moved out of [[Mission Dining Hall|Mission]]; Grab & Go will relocate from [[Goodrich Hall|Goodrich]]; and students will get new [[SU box|mailboxes]].  Students in the [[Frosh Quad]] will no longer have to put up with noisy construction, at least until the Stetson-Sawyer Project starts.
  
 
<div style="font-size: 14px; font-weight: bold; text-align: center;"><br>[[Project:Previously featured articles|previously featured]]</div>
 
<div style="font-size: 14px; font-weight: bold; text-align: center;"><br>[[Project:Previously featured articles|previously featured]]</div>

Revision as of 14:22, February 4, 2007


Willipedia is an unofficial, collaborative source of information and diversion written by Williams people. If there's something related to Williams that you know a lot about, or that people at Williams might find helpful, please contribute!

Paresky Center Opening

The Paresky Center is due to open during Winter Carnival of 2007, during which free food will be served during selected hours. It replaces the old Baxter Hall as the student center and a gathering point on campus. The Snack Bar will be moved out of Mission; Grab & Go will relocate from Goodrich; and students will get new mailboxes. Students in the Frosh Quad will no longer have to put up with noisy construction, at least until the Stetson-Sawyer Project starts.

Recently Updated

Failed to load RSS feed from http://wso.williams.edu/wiki/index.php?title=Special:Recentchanges&feed=rss|date|short|max=8: Error fetching URL: Maximum (2) redirects followed

Article Directory